Skip to content
MIVARE LABS SERVICES A SYSTEM FOR TECHNICAL, INSTALLATION AND SERVICE COMPANIES
Parts and time. Mivare Services Help Centre
AREA 04 · TECHNICIAN WORK · TOPIC 04

Parts and time

A technician records what they installed or used up and how many minutes the work took. This data stays with the job and goes into the report.

IN THE APP
Service › My work
IN THE APP
Job card › Work and Finish
TIME
In minutes
EDITING
Technician, owner, administrator
CONNECTIONS
2 modules

01What it is

In the Work tab, in the Parts and materials used section, you enter the name, quantity and unit. The quantity must be greater than zero. You can delete a wrongly added item, and adding a part is saved in the job history. You can enter a part by hand, with no stock, or pick it from the catalogue and take it from your own vehicle: the stock goes down, and deleting the item returns the quantity.

You enter the work time in minutes in the Finish tab, together with the visit result. Finishing the visit requires a work time of at least one minute. The Parts indicator on the job card shows the number of items.

Parts and time can be edited only while the visit is in progress. The dispatcher and office see them in the Work tab on the job card, and in the service report the parts and work time are listed for the client.

PARTS AND MATERIALS
Name, quantity and unit, for example pieces. Items can be deleted until the visit ends.
WORK TIME
The number of minutes saved when the visit is finished, required to change the status to Completed.
LOG
Adding a part is an entry in the job history.

02Tasks step by step

  1. STEP 1Start the visit and open the Work tab.
  2. STEP 2In the Parts and materials used section enter the name, quantity and unit.
  3. STEP 3Add the part. It appears in the table and in the report.

03What it connects to

TECHNICIAN WORK

Report and approval

The visit result and the report.

Go to the topicReport and approval