01What it is
In the Work tab, in the Parts and materials used section, you enter the name, quantity and unit. The quantity must be greater than zero. You can delete a wrongly added item, and adding a part is saved in the job history. You can enter a part by hand, with no stock, or pick it from the catalogue and take it from your own vehicle: the stock goes down, and deleting the item returns the quantity.
You enter the work time in minutes in the Finish tab, together with the visit result. Finishing the visit requires a work time of at least one minute. The Parts indicator on the job card shows the number of items.
Parts and time can be edited only while the visit is in progress. The dispatcher and office see them in the Work tab on the job card, and in the service report the parts and work time are listed for the client.
- PARTS AND MATERIALS
- Name, quantity and unit, for example pieces. Items can be deleted until the visit ends.
- WORK TIME
- The number of minutes saved when the visit is finished, required to change the status to Completed.
- LOG
- Adding a part is an entry in the job history.
02Tasks step by step
- STEP 1Start the visit and open the Work tab.
- STEP 2In the Parts and materials used section enter the name, quantity and unit.
- STEP 3Add the part. It appears in the table and in the report.
- STEP 1Open the Finish tab.
- STEP 2In the Work time field enter the number of minutes.
- STEP 3Save the result or finish the visit.
03What it connects to
Report and approval
The visit result and the report.
Go to the topicReport and approval